Garland Composite Elevated Water Storage Tank

GARLAND, TX

Neel-Schaffer helps growing community serve its water demands

Neel-Schaffer provided engineering design services for a new 2.5-MG composite elevated storage tank that was built on a 1.24-acre tract on the southwest corner of the intersection of McCree Road and Leon Road in Garland.

The $5.1 million project was completed in September 2017.

The basic services included site civil grading, site paving, site drainage, on-site water layout, landscaping, irrigation, fencing, pedestrian and vehicle gates, lighting, electrical, erosion control plan, security, supervisory control and data acquisition (SCADA), and design surveying.

SCADA and I&C design incorporated control and monitoring of all new process equipment and other items identified by the owner and engineer into the existing plant SCADA system.

The scope of services for this project also included water system modeling and water storage tank site selection analysis.

37 Offices Across 9 States

Contact Us